As we draw on our know-how and experience that we have acquired in the past, we are a future-facing team with a vision for the autonomous greenhouse of the future.
1999-2004
C. Yaylalı
Refmac Cooling Systems
The first «Water condensing central cold rooms devices» in Turkey
M.F. Balkı
Process Industrial Technical Services
Dismantling and Re-establishing Factory (Atıniplik)
First solvent recovery setup
2004-2010
C. Yaylalı
Refmac the third largest cold room equipment manufacturer in Turkey
M. Sevencan
Launched new brand Timfog
Timfog applied the first high pressure greenhouse humidification and cooling system in Turkey
2010-2014
C. Yaylalı – M. Sevencan
Acquisition of Timfog with the brand, customer, and production infrastructure
C. Yaylalı – M. F. Balkı
Establishment of Termomekanik with deep expertise in mechanical installation projects
Timfog applied the largest one-piece system for a 36 Ha greenhouse in Tunisia
A complete greenhouse climatization project agreement of 42 decares with a hot water boiler by using the recycled water in an electricity generation network in Belarus with the Israeli company Azrom
2015
Crone and Thermeta
Signed exclusive distributorship agreement for Turkey and CIS countries with the world's leading producer of greenhouse hot water boiler Dutch-Crone, and with Themeta, the Dutch manufacturer of greenhouse heating and CO2 systems
2016
Production of greenhouse fittings materials with respect to High pressure nozzles and fittings
Investing in machinery with an investment of approximately 1,0 Million USD, thus reaching the production capacity of greenhouse air conditioning up to 250 hectares per year.
2017
GAHU
The first Greenhouse Air Handling Unit was produced, combining all heating, cooling, dehumidification and humidification operations in one device
2018
VPD
The first "Intelligent Humidity Control System« designing our work around Vapor Pressure Deficit principle
2019
Signed the single-largest greenhouse climatization contract, a project size of 100 Ha
2020
Commercialization of GAHU
The greenhouse air handling unit began to be tested in a real environment in a 5-decare seedbed in November 2018 and the trials lasting 1.5 years were successfully completed. Then, in March 2020, it will be used in 3 seedling greenhouses and 14 decares of area. Greenhouse air handling units accomplish a first in the world greenhouse industry with their two-month performances